Toll loading facility at the Nyrstar smelter at Port Pirie
Service Provided: 4,500m3 of 40MPa ready-mix concrete
Project Summary: In 2008, a loading platform was required for Toll at the Nyrstar Smelter at Port Pirie. The project was specially engineered with reinforced concrete to facilitate heavy machinery loading trains with lead produced from the facility. The project was completed within timeframes and specifications.
Location: Port Pirie, SA
Client: McMahon Services
